Scaffold stability depends on the complete configuration, its support and the forces acting on it. Start with the applicable workplace regulation, the manufacturer’s instructions and any required engineered design.
Use the rule for your scaffold and jurisdiction
A single height-to-base ratio does not govern every supported or mobile scaffold. Confirm which height and base dimensions the applicable rule uses, the permitted configuration and all restraint requirements. Outriggers only contribute as allowed by the design and when installed correctly; their presence is not automatic permission to increase height.
For comparison, US construction rules require tipping restraint for supported scaffolds exceeding a 4:1 height-to-base-width ratio, with further tie and restraint provisions. That is a specific US requirement, not a Canadian tower-selection rule. OSHA 1926.451(c). For Ontario projects consult Regulation 213/91, including sections 129–130; for BC consult WorkSafeBC Part 13.
Plan support, restraint and loading together
- Verify bearing capacity, level support, settlement risk and manufacturer limits for levelling devices.
- Use the required braces, locks, decks, guardrails, safe access and restraints for the identified system.
- Confirm ties and anchors connect to a suitable structure and have the required capacity and layout. Cladding or decorative surfaces are not evidence of an adequate structural connection.
- Account for workers, stored material, tools, horizontal work forces, wind and any sheeting or enclosure. Changes can require a fresh design assessment.
- Follow the manufacturer’s restrictions for moving a mobile tower, occupancy during movement, wind and weather.
Do not assume contact between towers provides restraint
Simply placing another scaffold against the working tower does not demonstrate resistance to tipping, sliding or separation. Use such an arrangement only with documented design justification and acceptance under the applicable rules. Indoor location alone does not establish stability.
Engineering and competence
There is no universal 12-metre (approx. 39.37 ft) engineering trigger across Canada. Check the rule for the scaffold type and jurisdiction. Nonstandard arrangements, unusual loads, uncertain foundations or structural connections may require engineering even at lower heights. A competent worker’s inspection and a professional engineer’s design have different purposes; neither replaces the other when both are required.
Before use and after changes
- Match the erected scaffold to its documented configuration and permitted loading.
- Check foundations, levelling, restraints, braces, component condition, access and edge protection.
- Complete the inspections required by the governing rules and manufacturer.
- Remove access to unresolved or defective arrangements until corrected and reviewed by the appropriate person.
Find your province or territory’s official sources and keep the manual, applicable drawings and inspection records available for the job.